6 Dec 2022 - 2.1 hours

I finished drilling the right horizontal stabilizer skeleton and skin.


Then I began the task of deburring. I had previously done the edges of all the ribs, but now having match drilled all the holes, the holes needed to be deburred as well. Lots of time and effort, not much to show.