14 Nov 2025 - 2.5 hours

I finished up installing the last interior ribs on the right tank. I'm getting decently efficient at installing these ribs now, just in time to be done with them. I used 35 grams on these two ribs, but that was still too much. The ideal number for two ribs is probably around 30 grams but I guess that's information for other builders now.


Next I'll move onto the end ribs. These are a little more difficult to seal as you have the gaps around the leading edge of the ribs to fill. On the bright side, almost all of the rivets now can be reached with the squeezer rather than driven and bucked, so that should make things a bit less stressful.