3 Oct 2026 - 2.5 hours

I got both flaps clecoed to their bottom skins. It took a little head scratching to figure out how exactly the ribs were supposed to go. I drilled the ribs to the spars and then to the skins.

Then on the left flap, I drilled the spar to the skin which is kind of difficult because you also need to have the hinge in place and match drill the holes in that. I took my time getting it lined up according to the notes in the plans and then carefully drilled down the line of holes in the spar, clecoing every hole as I drilled them to keep the hinge in the right spot.

This was a good stopping point for the day so I'll pick up next time with the hinge on the right flap.