2 Jun 2024 - 2.5 hours
I finished cleaning up the elevator stiffeners from last night's session. Then I put them on onto the elevator skins and match-drilled them. I also drilled the doubler bracket for the trim motor in the left elevator. Once that was done, I took them back off and deburred the holes. I didn't get the holes on the skins done but I did get the holes on the stiffeners deburred.Here is the left elevator post drilling.
And the right one, too.