22 Jun 2024 - 2.2 hours
I've gotten the right elevator to a point where the next step is priming and I want to get all the elevator parts primed together in a big batch so I'm moving on to the left elevator. First I drilled the spar doublers to the spar.Then I again spent a fair bit of time getting the lead counterweight to fit under the counterbalance skin. Then I drilled the mounting holes through the lead weight.
I did a bit of deburring on the ribs and then drilled the ribs to the spar.