3 Dec 2022 - 1.2 hours

Today seemed like the first day of building something up rather than just small tasks, and I was rewarded at the end with the first airplane-ish looking part (but it will come apart a few more times before it's final assembly and riveting).

I added some holes to the HS-00006 nose ribs.


Then I assembled the left HS skeleton and match drilled all the holes there.


Finally, I clecoed the skin on to get ready for match drilling the skin to the skeleton. It's amazing how the wobbly skeleton becomes absolutely rigid as soon as the skin is attached!